Public Areas and Penthouses for the 5 star hotel, Jumeirah Marsa al Arab. Scope includes all architectural finishes, FF&E and decorative lighting in the lobby areas, penthouses, F&B, public circulation as well as Spa & Wellness.
Our design-build scope covered architecture, Fire Life Safety, MEP, structure, landscaping, lighting, acoustics, security, specialist F&B coordination, and full completion of finishes, IT/AV, kitchen, and spa equipment.
The scope of work includes the refurbishment of the existing 373 guestrooms and their associated corridors, including MEP works across levels 1 to 6, comprising 315 standard rooms and 58 suites, with an overall built-up area of 30,311 square meters.
The scope of work includes the fit-out of public areas, featuring 11 signature food and beverage outlets, a luxury spa, exclusive townhouses, Salon Privé, Delilah, executive offices, and a state-of-the-art theatre/ showroom.
Our scope encompassed the interior design fit-out for 96 guest keys, including the Presidential Suite, as well as dedicated food and beverage outlets, luxury spa facilities, and public areas, all contributing to a seamless and elevated guest experience.
The scope includes a fit-out of 257 luxury, spacious and contemporary guestrooms, suites, and serviced apartments, which will be located on floors 16 to 38 of the tower.
Refurbishment and renovation of United Nations Africa Hall in Addis Ababa, Ethiopia. Scope includes demolition, MEP, fit-out, FF&E as well as heritage works.
Fast track Design & Build refurbishment located at top of Burj Khalifa. Scope includes complete refurbishment of all architectural finishes as well as FF&E with modifications to MEP and specialist kitchen equipment